
Education Campus
International School Campus Package - Aluminium Glazing, Doors and Washroom Fixtures
Global education project — 2023
A campus procurement package for a multi-building education project, covering aluminium window systems, interior doors, washroom fixtures and selected exterior materials. Opening schedules, sample boards and batch tracking were used to keep specifications aligned with delivery phases.
$1.18M USD
Material Value
$820K USD
Landed Cost
$360K (31%)
Total Savings
14 weeks
Lead Time
Materials & Categories
Aluminium GlazingInterior DoorsWashroom FixturesExterior Materials
Total Area / Scope
1,200 m² glazing + 72 doors
Client Type
Education Institution
Market / Region
Global
Net Saving
$360K (31%)
Client Testimonial
“Opening schedules and sample boards caught details early. Splitting batches by building helped the project team control receiving and installation sequencing.”
Want a landed-cost estimate for a similar package?
Send your BOQ, destination and material categories. We will respond with cost assumptions and sample next steps.
Get an Estimate